Rawa Khola / Halesi: Situated in Khotang District, Province No. 1, this project utilizes a Horizontal Francis type machine designed for a discharge of 6.10 cumec and a net head of 101.15 meters.
Plan start by: November 2025 Capacity: 2×2.70 MW (Total: 5.40 MW) HRP length: 3.00 km; penstock length: 0.6 km. Surface type powerhouse. Location: Aiselukharka Rural Municipality, Khotang District, Province No. 1, Nepal. Type: Run of River Scope of Enhancement: No further enhancement scope available. Cascade Project: Yes Status: Feasibility studies completed; project license acquired; PPA in progress, expected to be signed soon. Planned Completion Date: May 2026
Daram B
Daram B: Located in Baglung District, this project features a Horizontal Francis type machine with a design discharge of 3.89 cumecs and a net head of 125 meters.
Plan start by: Aug 2025 Capacity: 2×2.00 MW (Total: 4.00 MW) Overview: Location: Tara Khola Rural Municipality, Baglung District, Gandaki Province, Nepal. Type: Run of River Scope of Enhancement: No further enhancements are planned. Cascade Project: Yes Status: All necessary statutory approvals obtained; design works underway. Planned Completion Date: December 2026