In-Flight​

Madhya Tara Khola (MTK)

Madhya Tara Khola (MTK):  Located in the Baglung District of Gandaki Province, this project features a Horizontal Francis-type machine designed for a discharge of 2.20 cubic meters per second (cumec) and a net head of 120 meters. 

Capacity: 2×1.1 MW + 10% Col (Total: 2.42 MW)
HRP length: 3.50 km; penstock length: 1.00 km. Surface type powerhouse.
Location: Tara Khola Rural Municipality, Baglung District, Gandaki Province,Nepal
Type: Run of River
Scope of Enhancement: 85% completed, no further enhancement scope.
Cascade Project: Yes
Status: Civil works completed; H/M & E/M 80% completed, ongoing activities expected to conclude soon.
Planned Completion Date: April 2025

Daram – A

Daram – A: Located in Baglung District, this project employs a Horizontal Francis type machine with a design discharge of 3.75 cumec and a net head of 127.20 meters. 

Capacity: 2×2.00 MW (Total: 4.00 MW)
HRP length: 2.00 km; penstock length: 1.00 km. Surface type powerhouse.
Location: Tara Khola Rural Municipality, Baglung District, Gandaki Province, Nepal.
Type: Run of River
Scope of Enhancement: No further enhancement scope.
Cascade Project: Yes
Status: Overall design completed; 10% of civil works done; construction to resume after monsoon (end September 2024).
Planned Completion Date: Feb 2026