Likhu-3: The Likhu project spans Okhaldhunga and Ramechhap Districts, utilizing a Vertical Francis-type machine with a design discharge of 22.9 cumec and a net head of 158 meters. Capacity: 3×10.00 MW (Total: 30.00 MW)
Overview: Head race tunnel: 4.0 meters diameter, approx. 4.00 km; penstock: 300 meters (3.00 meters diameter). Surface type powerhouse. Location: Okhaldhunga & Ramechhap Districts, Nepal. Type: Run of River Scope of Enhancement: No further enhancements are planned. Cascade Project: Yes Status: Site development works completed; financial closure achieved; tunnel works to commence post-monsoon. Planned Completion Date: Mid-2027